Grey Flow Pro
Grey Flow Pro System Requirements
- The dripline should be kept below mulch or soil (check for local State, Municipal & Council laws and regulations)
- 240 volts power supply should be available
- PVC plumbing parts to be installed by a license plumber
- Minimum garden area required applies. (REF TABLE 1.0)
- The Grey Flow Pro should be turned off during wet conditions and at any sign of ponding or run off.
- All setback distances for the irrigation system must be in accordance to the local regulations.
TABLE 1.0